Skip to main content

2025 Bond Update: John Tuck Playground Asphalt Surface Project

Posted Date: 03/24/26 (12:50 PM)



John Tuck Elementary has received a brand-new playground surface. The old asphalt was hazardous, with large cracks that made it easy for kids to trip. The new surface is safe, clean, and features fresh lines for four square, basketball, and a gaga ball pit.

Additionally, there are dots on the surface to help students line up and stay organized. Thank you to the Redmond community for making this project possible.