October 2026 Capital Bond Program Update
Click the image to view the full report
Construction continued across Redmond School District in October, with much of the work focused on completing summer projects and moving larger construction projects forward. While activity typically slows during the school year, work continued at Redmond High School and Tumalo Community School as both projects progress toward their scheduled 2027 completion.
Redmond High School Modernization
The Redmond High School modernization project continued to advance in October, with construction taking place across several areas of campus.
At the Agriculture addition, interior finish work progressed, including casework installation and preparation for polished concrete flooring. Work on the Wrestling addition neared completion, and the renovated wrestling space was turned over to the school for athletic use while remaining work continued.
Crews also began overhead installations in the Commons and Art classrooms in preparation for new fireproofing. Roof replacement advanced on the east athletics roof, and demolition and abatement continued in the media center and adjacent classrooms as part of the next construction phase.
The project also includes improvements to the CTE spaces, auditorium, performing arts areas, athletics facilities, Commons and building systems. Construction is continuing in phases to support school operations and student access to campus.
Tumalo Community School Addition and Renovation
The Tumalo Community School project was 49% complete at the end of October. The project includes facility upgrades and renovations, along with four new instructional spaces: classrooms for sixth, seventh and eighth grades and a dedicated science room.
During October, construction focused on structural framing and roof work at the cafeteria and kitchen remodel and the classroom and science addition. Crews advanced wall framing, roof sheathing and building systems coordination. Fire sprinkler rough-in also began at both additions.
Work on mechanical systems and controls continued alongside construction, including testing and adjustments to support the upgraded building systems.
Athletic Fields and Track Improvements
The District's athletic field and track projects include improvements at Obsidian Middle School, Elton Gregory Middle School, Redmond High School and Ridgeview High School.
The summer 2025 track and turf improvements are complete. These projects included artificial turf and track surface replacements at Redmond and Ridgeview high schools, along with track surface improvements at Obsidian and Elton Gregory.
The Ridgeview High School tennis court replacement was also completed in August 2026. In October, the project team completed punch-list work and final measurements for closeout documentation and coordinated with the City of Redmond on required infiltration testing.
Hugh Hartman Elementary Roofing Project
The Hugh Hartman Elementary roofing project was completed in August. The work included replacing existing asphalt shingle roofing and upgrading the low-slope roofing system.
In October, the project team conducted final punch-list walkthroughs and coordinated the manufacturer's final site visit. Remaining work is focused on project closeout documentation.
Terrebonne Community School Cooling Retrofit
The cooling retrofit at Terrebonne Community School was completed in August. The project upgraded and expanded existing mechanical systems to provide cooling in areas that were previously unconditioned and brought system controls up to District standards.
In October, testing, adjusting and balancing continued to verify system performance. Commissioning meetings also continued, and the manufacturer completed on-site training for the District's new chiller. Remaining work includes final testing, training and project closeout.
Questions or More Information
For questions, comments or additional information about the 2024 Capital Bond Program, contact:
Chad Franke, Program Manager
HMK Company
916 SW 17th Street, Suite 204
Redmond, OR 97756
971.304.0710
chad.franke@hmkco.org